Investorideas.com  big ideas for global investors Search www.investorideas.com
   Members       Sign-up       Newsfeeds        Companies        Stock Directories       Research       Video       Funding   




AddThis Social Bookmark Button

Category: Investment, Gold, Mining

Mining Stock News: SilverCrest (TSX.V: SVL) Announces Q2 Production 139,850 Ounces Silver & 8,584 Ounces Gold

Category: Investment, Gold, Mining

Visit this company: SilverCrest Mines Inc.

VANCOUVER, BRITISH COLUMBIA - July 23, 2012 (Investorideas.com Mining Stocks Newswire) SilverCrest Mines Inc. (TSX-V:SVL)(OTC.BB:STVZF) (the "Company") is pleased to announce production figures for the second quarter of 2012 from its 100% owned Santa Elena Mine located in Sonora, Mexico.

Second Quarter Production Highlights

  • Silver produced oz: 139,850; 87% increase over Q2 2011
  • Gold produced oz: 8,584; 57% increase over Q2 2011
  • Ore Tonnes crushed: 317,958; 33% increase over Q2 2011
  • Silver oz to pad: 403,264; 14% increase over Q2 2011
  • Gold oz to pad; 13,764; 10% decrease over Q2 2011

J. Scott Drever, President stated; "Operations at the Santa Elena mine enjoyed a robust second quarter with silver and gold production comfortably in line with our 2012 production guidance. This is the third consecutive quarter that we have operated at full, planned production rates. The crusher throughput averaged approximately 3,494 tonnes per day for Q2, 2012, compared to a plan of 2,500 tonnes per day. The open pit tonnes and grades continue to track closely with our geological block models and open pit mine plan. Cash costs for the quarter are anticipated to be consistent with our guidance of $8.20 per silver equivalent ounce. As a result of the strong first half of the year and projected production for the second half, the Company anticipates meeting or exceeding its 2012 production guidance of 435,000 ounces of silver and 33,500 ounces of gold."

Investorideas.com Mining Newswire

Operations during Q1, 2011 were still in ramp up mode so are not directly comparable to those quarters where steady state production has been achieved. The strip ratio for Q2, 2012 remains above the target of 3.9:1 due to accelerated waste removal under a revised mine plan to accommodate additional lower grade material in the footwall of the deposit and to assure access to higher grade ore for the balance of the year. The average revised strip ratio for 2012 is estimated at 5:1 with projections for 2013 to be less than 2:1. The crusher throughput was higher for Q2 due to increased operating hours, improved efficiencies with greater availability of the crushing circuit. Silver and gold grades of ore loaded on the pad were marginally lower due to lower grades from the open pit and processing of low grade stock pile material. For the remainder of 2012, the Company anticipates a lower strip ratio than Q2 2012, above budget crusher throughput, and higher mine grades.

N. Eric Fier, CPG, P.Eng. and Chief Operating Officer for SilverCrest Mines Inc. and Qualified Person for this news release has reviewed and approved its contents.

SilverCrest Mines Inc. (SVL.V)(STVZF) is a Mexican precious metals producer with headquarters based in Vancouver, BC. SilverCrest's flagship property is the 100%-owned Santa Elena Mine, which is located 150 km northeast of Hermosillo, near Banamichi in the State of Sonora, Mexico. The mine is a low cost, high-grade, epithermal gold and silver producer, with an estimated life of mine cash cost of US$8 per ounce of silver equivalent (55:1 Ag:Au). SilverCrest anticipates that the 2,500 tonnes per day facility should recover approximately 4,805,000 ounces of silver and 179,000 ounces of gold over the 6.5 year life of the open pit phase of the Santa Elena Mine. A three year expansion plan is underway to double metals production at the Santa Elena Mine and exploration programs are rapidly advancing the definition of a large polymetallic deposit at the La Joya property in Durango, Mexico.

FORWARD-LOOKING STATEMENTS

This news release contains "forward-looking statements" within the meaning of Canadian securities legislation and the United States Securities Litigation Reform Act of 1995. Such forward-looking statements concern the Company's anticipated results and developments in the Company's operations in future periods, planned exploration and development of its properties, plans related to its business and other matters that may occur in the future. These statements relate to analyses and other information that are based on expectations of future performance, including silver and gold production and planned work programs. Statements concerning reserves and mineral resource estimates may also constitute forward-looking statements to the extent that they involve estimates of the mineralization that will be encountered if the property is developed and, in the case of mineral reserves, such statements reflect the conclusion based on certain assumptions that the mineral deposit can be economically exploited.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including, without limitation: risks related to precious and base metal price fluctuations; risks related to fluctuations in the currency markets (particularly the Mexican peso, Canadian dollar and United States dollar); risks related to the inherently dangerous activity of mining, including conditions or events beyond our control, and operating or technical difficulties in mineral exploration, development and mining activities; uncertainty in the Company's ability to raise financing and fund the exploration and development of its mineral properties; uncertainty as to actual capital costs, operating costs, production and economic returns, and uncertainty that development activities will result in profitable mining operations; risks related to reserves and mineral resource figures being estimates based on interpretations and assumptions which may result in less mineral production under actual conditions than is currently estimated and to diminishing quantities or grades of mineral reserves as properties are mined; risks related to governmental regulations and obtaining necessary licenses and permits; risks related to the business being subject to environmental laws and regulations which may increase costs of doing business and restrict our operations; risks related to mineral properties being subject to prior unregistered agreements, transfers, or claims and other defects in title; risks relating to inadequate insurance or inability to obtain insurance; risks related to potential litigation; risks related to the global economy; risks related to the Company's status as a foreign private issuer in the United States; risks related to all of the Company's properties being located in Mexico and El Salvador, including political, economic, social and regulatory instability; and risks related to officers and directors becoming associated with other natural resource companies which may give rise to conflicts of interests. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the forward-looking statements. The Company's forward-looking statements are based on beliefs, expectations and opinions of management on the date the statements are made. For the reasons set forth above, investors should not place undue reliance on forward-looking statements.

The information provided in this news release is not intended to be a comprehensive review of all matters and developments concerning the Company. It should be read in conjunction with all other disclosure documents of the Company. The information contained herein is not a substitute for detailed investigation or analysis. No securities commission or regulatory authority has reviewed the accuracy or adequacy of the information presented.

J. Scott Drever, President

SILVERCREST MINES INC.

Neither TSX Venture Exchange nor its Regulation Services Provider (as defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contact:

SilverCrest Mines Inc.
Fred Cooper
(604) 694-1730 ext. 108
Toll Free: 1-866-691-1730
(604) 694-1761 (FAX)
info@silvercrestmines.com
www.silvercrestmines.com

Disclaimer: Investorideas.com does not make stock recommendations. Nothing on our sites should be construed as an offer or solicitation to buy or sell products or securities. We attempt to research thoroughly, but we offer no guarantees as to the accuracy of information presented. All Information relating to featured companies is sourced from public documents and/ or the company and is not the opinion of our web sites. This site is currently compensated by featured companies, news submissions and online advertising. Silvercrest Mines has compensated Investorideas for annual news publication and distribution and company profile: nine thousand seven hundred starting August 2012

More info: www.InvestorIdeas.com/About/Disclaimer.asp

BC Residents and Investor Disclaimer: Effective September 15 2008 - all BC investors should review all OTC and Pink sheet listed companies for adherence in new disclosure filings and filing appropriate documents with Sedar. Read for more info: http://www.bcsc.bc.ca/release.aspx?id=6894

Free Investor newsletter at Investorideas.com - the next great investor idea !
Email:  
For Email Newsletters you can trust


TOP

Investor Ideas © 2000 - 2015 InvestorIdeas.com®, ECON

 

login | logout | about us | contact | disclaimer / disclosure |
partners / links | job search | privacy policy |
advertise | trade | sitemap |